EVALUASI WAKTU DAN BIAYA PROYEK KONSTRUKSI MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (PDM) DAN CRASHING

  • Muhammad Yuda Isyaracsa Universitas Nusa Putra
  • Lioba Evita Anikusuma Universitas Nusa Putra
Keywords: Precedence Diagram Method (PDM), Crashing, Critical path, time and cost

Abstract

Construction projects require effective time management to minimize delays that can lead to increased costs and project completion delays. This study aims to analyze the time and cost evaluation of a two-story residential construction project using the Precedence Diagram Method (PDM) and Crashing to identify the critical path and determine the most efficient acceleration alternatives. This study uses the PDM method to construct a work network, identify the critical path, and calculate the project duration through forward pass, backward pass, and total float analyses. Subsequently, the Crashing method is applied by adding labor and overtime hours to evaluate time acceleration and changes in project costs. The analysis results show that the normal project duration is 37 weeks with the critical path A–B–C–D–E–F–H–I–M. Applying the Crashing method by increasing the workforce by 15% or adding overtime hours can accelerate the project duration to 33 weeks. However, the overtime option is more efficient because it achieves the same acceleration with a lower cost increase compared to increasing the workforce. Thus, the PDM method is effective in identifying the critical path, while the Crashing method using overtime is the most optimal acceleration alternative based on time and cost considerations.

References

Putra, A. A., & Islah, M. (2018). Perencanaan Waktu Dalam Pelaksanaan Konstruksi Dapat Mengurangi Tingkat Kerugian, Kesalahan Di Dalam Pengerjaan Suatu Proyek. Jurnal Teknik Industri Terintegrasi (JUTIN), 1(1).

Yessy, Y., & Gondokusumo, O. (2024). OPTIMASI PENJADWALAN PADA PROYEK PEMBANGUNAN RUMAH TINGGAL DENGAN MEMPERHITUNGKAN ALIRAN KAS. JMTS: Jurnal Mitra Teknik Sipil, 907-914.

Putra, P. (2025). Pengendalian Waktu Pekerjaan Konstruksi Pembangunan RSUD Dr. Sobirin Kabupaten Musi Rawas: Analysis of Time Control for Construction Work for the Construction of Dr. RSUD. Sobirin, Musi Rawas Regency. LITERA: Jurnal Ilmiah Mutidisiplin, 2(1), 154-168.

Alim, P. C. R., Pratiwi, R., & Devi, S. M. (2026). Analisis Keterlambatan Proyek Pembangunan Gudang dengan Precedence Diagram Method (PDM) dan Program Evaluation and Review Technique (PERT). Jurnal Talenta Sipil, 9(1), 116-130.

Mardiana, M. (2024). PERBANDINGAN OPTIMASI WAKTU DENGAN MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (PDM) DAN CRITICAL PATH METHOD (CPM).(Studi Kasus: Proyek Pembangunan di MAN 1 Polewali Mandar) (Doctoral dissertation, universitas hasanuddin makassar).

Rivaldy, M., Oppier, I., Sangadji, F. A., & Latuconsina, S. I. (2023). Optimalisasi Pelaksanaan Pekerjaan Dengan Menggunakan Metode Crashing Pada Pembangunan Rumah Susun Pemerintah Kota Tual. Jurnal MESIL (Mesin Elektro Sipil), 4(1), 11-16.

Rahmawati, V. L. (2024). EVALUASI PENGENDALIAN WAKTU DAN BIAYA DENGAN BIAYA LANGSUNG (DIRECT COST) DAN BIAYA TIDAK LANGSUNG (INDIRECT COST) MENGGUNAKAN METODE TIME COST TRADE OFF PADA PEMBANGUNAN GEDUNG ASRAMA (Studi Kasus: Asrama Putri Pasca Sarjana UIN Maulana Malik Ibrahim Malang (Doctoral dissertation, Universitas Islam Balitar).

Nashri, N., & Syamsuri, S. (2025). Analisis Penjadwalan Dengan Metode Precedence Diagram Method Pada Proyek Revitalisasi Gedung SDN 21 Salomenraleng Kecamatan Tempe Kabupaten Wajo. Jurnal Teknik Sipil Universitas Lamappapoleonro, 4(1), 1-17.

Oetomo, W., Priyoto, P., & Uhad, U. (2017). Analisis waktu dan biaya dengan metode crash duration pada keterlambatan proyek pembangunan jembatan Sei Hanyu Kabupaten Kapuas. Media Ilmiah Teknik Sipil, 6(1), 8-22.

Putri, D. A. (2023). Pelaksanaan Keputusan Menteri Tenaga Kerja Dan Transmigrasi Republik Indonesia Nomor 102 Tahun 2004 Tentang Waktu Kerja Lembur Danupah Kerja Lembur Pada Pt. Catur Mitra Sejati Sentosa Di Kota Pekanbaru (Doctoral dissertation, Universitas Lancang Kuning).

Ananda, S. O., & Novani, S. (2024). PRESCRIPTION COVERAGE IMPROVEMENT STRATEGY FOR PHARMACY OUTPATIENT INSTALLATION AT PREMIER JATINEGARA HOSPITAL.

Wiraningsih, P. I. P. (2024). Analisis Reduksi Durasi Proyek Metode Crashing Dengan Penambahan Waktu Kerja (Studi Kasus: SDN Werdi Bhuwana). Reinforcement Review in Civil Engineering Studies and Management, 3(2), 94-108.

Published
2026-08-27
How to Cite
Muhammad Yuda Isyaracsa, & Lioba Evita Anikusuma. (2026). EVALUASI WAKTU DAN BIAYA PROYEK KONSTRUKSI MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (PDM) DAN CRASHING. Didaktik : Jurnal Ilmiah PGSD STKIP Subang, 12(03), 353 - 362. https://doi.org/10.36989/didaktik.v12i03.18586